Hey all. Can't wait to learn more about the BBB method as that is what I want to use when we get the pool set up. We are not setting it up until I have and know what to do with the chemicals. We got an Intex 18' x 48" ultra metal frame pool. I have read over the recipe and 7 day start up plan but of course I am a little confused.
1) why is it called 7 day start up when it should take a day to fill?

2) with the bbb method why am I having to buy dichlor?

3) after the initial fill and chemical adding where do I go for there? That's where I get lost because of having to use the dichlor and not just the bleach and borax and baking soda.

4) will I only ever need bleach baking soda and borax? Or are there other things that I will need to add to balance things out.

5) can I use a 5 way test kit?

Sorry for the questions and I hope someone can clear it up for me.

Thanks in advance!
Christina