Originally Posted by
us7sail
thanks for all the replys.
The electrician who gave the bid says he does pools all the time so i would have thought his time would have been less than the 16 hrs proposed.(especially with two people) The main trench is already been dug to the pad and that run is straight and right to the main box about 45' away. The bonding to light coping ladder and stair rail is the only other real issues. convience receptical will be at the pad. I do not object to material cost so much ($700) but $1800 for labor sound crazy. this AM another guy gave a bid for 2500. I am very much thinking of getting the code book and doing it my self. (The whole thing will be inspected any way an I am in no hurry)I have run many circuits before. I did not think prices would be that out of wack. Thanks chris