Nice! Thanks All!
Finished leveling this afternoon. Tomorrow morning, checking leveling one final time, followed by laying down a tarp, then foam board (Gorilla tape on all seams), the pool ground cover on top of that, and then pool assembly, and finally dropping the hose in to start filling. I have been so meticulous in getting the leveled spot perfect, it almost seems to good to be true? We'll see.
Picked up all other chemicals needed in the SS Recipe, and for the BBB method of continual care! Wish me luck!
Bookmarks