I notices Matt4x4 has indicated he used 2' of something about 1' up under before the sand coving. What type of plastic was used? Just regular plastic sheeting or is it specific kind or mil of thickness? Has anyone put any type of foam on the walls before installing the vapour sheeting? If so, would that help keep the water temp steady? or is it a waste?
Our pool is set to be delivered on April 10. We won't be able to set it up until May sometime due to WINTER just hanging around forever, but I thought I would get everything lined up and ready to go. We farm so have our own dozer and can level the spot well, we have our own gravel pit for sand, but think I may just check on ordering sand that is already sifted/filtered out of rocks. 4-5 yards for 18x33 is what I was told. Just want the best bottom, side prep I can get before putting in the liner (J-hook)
THANK you for any and all advice, help and assistance. New to a PERM pool (thank GOD, no more setting up, taking down every year!!!)
Bookmarks