Hey, Thanks for the quick replies! This was a new pool installation. The poolcrete is poured on top of a shaped dirt floor. PB and I discussed a bad batch of poolcrete, both agreed that any talks with the poolcrete manufacturer would point back to the installer/PB.
I speculate that PB was holding himself to a scheduled completion date. I had noticed the rough seems, but... relied on PB to do the right thing. ughh.
Water was trucked in from a nearby city water facility. I will include the trucking costs in our discussions before PB drains and removes the liner to repair the floors. We are planning on doing this next month. I'm leary of letting this go until the spring... PB may disappear! Good thing I've withheld $$$
-m
Bookmarks