Glepage,
I have the same size pool as you do and my installer suggested to fill it about 1/4 of the way up with the garden hose to let the liner settle in place and then fill it the rest of the way with a truck or fire hydrant (if available). I actually have a hydrant in the corner of my yard, so I made a donation to the fire department and they came out and finished filling it up for me. We were swimming 45 minutes later, no wrinkle problem at all. This year I put a new liner in and filled it up with a garden hose. If you have decent water pressure you should be able to fill it in a about 2 days.
Bookmarks