Watched them put up our AG pool several years ago and the installers dig out the high side to be the same as the low side and the equipment has a laser level. Pretty neat. Then they hand dug places for concrete blocks, and checked the level of those in reference to each other. However my back yard has a slope to it! I have always heard that it should be within 1" level.