Curved side patio blocks are in, level under base plates and backfilled, rail is on - this part was all evening after work today. We still have a small discrepancy between the second straight side upright and the rest - BOTH are about 1/4-1/2" short from the rest. We will try to shimmy them back a bit more before the wall goes up. Tomorrow, we put some landscape fabric down and thats probably it, our lives have been on hold for over a week already - sand comes Wednesday morning. If all goes well, we hope to get walls up on Wednesday or Thursday and we took a vacation day to get liner in on Friday (79 and sunny expected!) - filling will start then! I have a case of bleach on standby. All the best laid plans....hope Mother Nature cooperates!
Beats driving to the lake!
18'x33'x52" AG oval, hard plumbed system, 22" Pentair Meteor Filter 1.5hp pump, Goldline SWCG System, 2/4x20 SolarBear Panels, Biltmore Steps - 16x14' composite deck, Pool Rover Jr