Deck is done, pump and filter have been relocated and now we are working on burying the PVC/hoses that will run from the pump/filter's new location to the area where my solar panels go. If we can get a few dry days, this should be finished this week. Also, still have to install the pool steps which mount on the top of the new deck. Then, I'll take some pics and post them.
I also bought a large (11.5 ft.) off-set umbrella that will shade a portion of my deck. I get tired of having to continually move my umbrella stand around the deck to account for the position of the sun. This new umbrella won't totally solve that problem, but will help for much of the day.
Anxious to swim!
Bookmarks