You do not want to tie the pool coping to the pool deck. Keep the flagstone coping over-hang over the bond beam on the deck side to a minimum because the pool and the ground around it will move at a different rate when the temperatures change. On the back of the bond beam coping flagstone install Poli-Void roll foam then install the deck stone. Then zip the top of the foam off (instructions come with the Poli-Void), fill the gap with a caulk that will match the color of the grout used for the stone on the deck. While the caulk is still wet then apply sand on it to match the color of the sand in the stone grout (the idea is to make the caulk and sand look like the mortar between the stone work). Nothing ruins the look of a good stone job than to have a caulk joint that does not match the surrounding material.
Bookmarks