thanks for the quick reply. pump is set-up for 2". existing lines are 1 1/2". used a bushing for transition. glue was new. even used the green glue for the pvc to abs spots. maybe just should let it sit longer cause its pressure? i could change whats above ground to 2" but would still have 1 1/2 under ground.