I am having a Carlton cement pool installed and when they tested the airlines they found a leak under the poool decking or inside the pool itself. We were about 2 weeks away from swimming. I am having a hard time getting a hold of someone at Carlton to give me an answer on when they will come to fix it. The Carlton plumber was out last Friday and told me he wanted to come out on Monday to start ripping up some of the concrete around the skimmer to find the problem. I have about 1500 sqft of exposed aggregate decking poured around the pool and the leak was definitely traced to where the pipes go under the decking. Any advice on how to deal with Carlton or on what they should be doing to find the location of the leak would be appreciated.
Thanks
John

about anything that doesn't go according to plan. The plumber from Carlton seems pretty good and he insists that he pressure tested prior to the deck being poured (and I think hes right). We checked where the pipes go under the decking and no stake through the pipes so the decking guys did not break a pipe there. THere is a good chance the broke a pipe when the poured around the skimmer. I recollect a pipe sticking out the ground in the area that had been moved by the guys pouring the cement shell of the pool. Well nobody showed up again today and no one is returning my calls so I guess I will keep leaving messages.

Bookmarks