Thank you for your reply. I will make a sketch to show my idea.
Basically, I was looking at the Pentair Deck Jet II. Was planning to tee off of the return line with a 1" pipe. That would then branch into two 3/4" lines and each would have ball valves. I would then go into the ground about 6" and run the 3/4" lines to their respective jets. The lines will get blown out in the winter.
Bookmarks