Re: Time to replace sand?
Thanks Carl. Ben's chart shows that given my CYA of 100 to 200, my FC level should be 8 to 15 ppm). However, I have a lot of ammonia so Ben gave me a treatment plan to follow until the CC is down to 1 or 2. The interim plan is to add 6 gallons of bleach every evening, add a pint of muratic acid when the pH creeps above 7.0, and keep aerating.
Taylor K-2006, IG Vinyl 26,000g, Sand filter 275 lbs, 3/4 HP Hayward Super Pump II, CYA over 100, Using 12.5% bleach
18'x36' rectangle 26K gal IG pool; Liquid Chlorine 12.5% ; Sand Filter 275 lbs. sand filter; Hayward Super Pump II 3/4 HP pump; 23 hrshrs; Taylor K-2006; delivered via truck; summer: ; winter: ; iPad; PF:4.6
Bookmarks