Hi everyone...not sure if this will be a double post...if so sorry about that. Just sending an update, the liner is ordered and hopefully being manufactured this week. As I mentioned, I sent a sample of the old liner bead and my salesman said it was a standard bead. I need to do a lot of prep work before this liner can go in...removing the old liner, sanding and spray painting the walls as well as filling in holes and leveling the sand bottom. I have 2 more questions for you awesome pool folk...how far in advance can I start this prep-work (I anticipate receiving the liner in 10 days or so) and is there any special sand I need to get for the floor? I'm assuming children's sandbox type sand because there are no pebbles etc. Thank you for this wonderful and informative site!Kath
Bookmarks