So after three weeks of rain we are grading this Saturday. The pool is an 18 by 33. I have the paperwork from the original install and they ordered 6 tons of sand. I am assuming I will need the same. Does anyone have any imput on that. Also, the ground where the pool is being located is extremely wet this time of year. It usually dries by the first week of June but with all the rain this year I sense we are looking at third week of June. I got to thinking perhaps it makes sense to put some drainage under the pool. Has anyone done this? Do I even need to worry about it once installed?