Newbie on the site! Looks like lots of good info. I'm in the process of having a 24' found AGP installed. I've done some preliminary digging and have talked to the excavator who said he commonly will build up a low side in order to level. I've dug about 2.5' out of the high side already. Most of what I've read said avoid building a low side as much as possible. Is there a standard operating procedure in the event that a portion of the foundation has to be built up? How about special materials or fill needed? thanks.