Well, the contract was signed last Friday. Excavaters showed up on Wednesday as scheduled. Dig went well. The excavation crew warned us in advance that we would probably lose phones and cable. They never put the lines in the ground deep enough. The excavaters won that bet (No Cable, No Phones). Steel showed up today (Thursday). Should be finished shortly. Plumber is on his way for the short stub. Inspection occurs tomorrow (Friday). Gunite early Saturday morning. Here are the pics I promised.
22 x 36 IG Pool
7' Spa
4' x 9' Tanning ledge
2 - swimouts w/ seating
http://i112.photobucket.com/albums/n...ruction001.jpg
http://i112.photobucket.com/albums/n...ruction003.jpg
http://i112.photobucket.com/albums/n...ruction004.jpg
http://i112.photobucket.com/albums/n...ruction007.jpg