Re: Steve's pool build status - Work started 2/19/2007!
Congrats, everything is looking great and your on a really good turn.
If I were to point out anything I'd object to, as a contractor, it would be your posts.
An ACQ 60 4"x6" post could have been incorporated into your covered porch and then wrapped with Hardee siding or Western red Cedar. It would finish a lot cleaner than the treated pine posts that currently hang out further than your beams.
If you were to wrap the post now they would finish out much wider than the beam. I'm not knocking the way they did it, but I'd encourage you to have them trim the top up to the soffit to make it a little more eye appealing than the way it is now. The 6x6 post butting up to and hanging out wider than the 4" beam just has a rough uncompleted look to it. This will be much more noticeable after painting than it is now.
just my .02
See ya,
Kelly
Re: Steve's pool build status - Work started 2/19/2007!
Quote:
Originally Posted by
huskyrider
Congrats, everything is looking great and your on a really good turn.
If I were to point out anything I'd object to, as a contractor, it would be your posts.
An ACQ 60 4"x6" post could have been incorporated into your covered porch and then wrapped with Hardee siding or Western red Cedar. It would finish a lot cleaner than the treated pine posts that currently hang out further than your beams.
If you were to wrap the post now they would finish out much wider than the beam. I'm not knocking the way they did it, but I'd encourage you to have them trim the top up to the soffit to make it a little more eye appealing than the way it is now. The 6x6 post butting up to and hanging out wider than the 4" beam just has a rough uncompleted look to it. This will be much more noticeable after painting than it is now.
just my .02
See ya,
Kelly
Kelly,
The 6x6 beams are going wrapped in a 15" brick column. I left 5 1/2" between the post and the gutter downspout. If I was going to have exposed beams I would have done it very different. I had to wait until the deck was done for them to do the columns. Thanks!
Steve
Re: Steve's pool build status - Work started 2/19/2007!
Days 25 & 26 - 3/16 & 3/17
We had some rain on days 23 and 24 and that delayed the Pebble Tec install.
On Friday 3/16 the rock guys started work on the flagstone inlays, firepit and bench. On Saturday 3/17 the Pebble Tec got installed and the outdoor kitchen was delivered.
Firepit and bench in progress - You can see some of the inlays to the side of the fire pit but they are covered in stone dust.
http://www.lanability.com/images/IMG_0646.JPG
Another shot of the fire pit and bench
http://www.lanability.com/images/IMG_0648.JPG
Setting up for the Pebble Tec. This was very cool to watch. They had ropes running the length of the pool to hang their water sprayers and rollers.
http://www.lanability.com/images/IMG_0632.JPG
Spraying it in
http://www.lanability.com/images/IMG_0633.JPG
Washing off the mortar to expose the pebbles.
http://www.lanability.com/images/IMG_0640.JPG
Continued in next post
Re: Steve's pool build status - Work started 2/19/2007!
There she is waiting to get acid washed.
http://www.lanability.com/images/IMG_0641.JPG
Closeup of the tanning ledge
http://www.lanability.com/images/IMG_0642.JPG
Here is the outdoor kicthen. It still needs to be assembled and leveled. Once that is done the countertop and stone work needs to get done.
http://www.lanability.com/images/IMG_0645.JPG
View from the back. It will have a grill, fridge, sink and side burner. It came on 3 pallets and weighed 1290 lbs!
http://www.lanability.com/images/IMG_0649.JPG
Today they are acid washing the pool and starting the fill. It is getting close now.
Steve
Re: Steve's pool build status - Work started 2/19/2007!
I think your outdoor kitchen is bigger than my ONLY kitchen!! :p
Looking great... betcha can't wait for summer!! :D
Re: Steve's pool build status - Work started 2/19/2007!
Quote:
Originally Posted by
GraceByDesign
I think your outdoor kitchen is bigger than my ONLY kitchen!! :p
Looking great... betcha can't wait for summer!! :D
The sad thing is it is bigger then mine as well. The outside of my house is now much nicer then the inside!
Steve
Re: Steve's pool build status - Work started 2/19/2007!
Steve,
Things are looking great. Looks like you have a great bulider. Sure does keep the headaches to a minimum. I betcha you and the family can't wait. It won't be long now. Keep the pics coming. Good luck!!!
Re: Steve's pool build status - Work started 2/19/2007!
Quote:
Originally Posted by
divnkd101
Steve,
Things are looking great. Looks like you have a great bulider. Sure does keep the headaches to a minimum. I betcha you and the family can't wait. It won't be long now. Keep the pics coming. Good luck!!!
Yea, the weather has been nice and everything is moving along nicely. I am real excited. Thanks!
Steve
Re: Steve's pool build status - Work started 2/19/2007!
Day 28 - 3/19
They did the acid washing yesterday and started filling the pool. Pretty cool that is only took 28 days from the dig until water got put in. They are doing the final cleanup today. They will need to do another smaller cleanup when the rock work is completed but it is getting closer to the end. The only things that are left include:
- Finish fire pit and bench
- Countertop and stone install on outdoor kitchen
- Landscaping
- Brick columns and painting on the patio cover
Steve
Re: Steve's pool build status - Work started 2/19/2007!
Wow - that was fast, I didn't think it would be possible to build one that quickly due to the time needed for flooding/compacting grades, and curing times for the 'crete in the pool and the deck. congrats!