Well we started digging last Saturday and wow, that is a lot of dirt. However, though all the excitement, they nailed our sewer main. I couldn't have laid the pool better, the sewer goes down the center of the pool the full length. So, we now have to have another trench dug ta few feet to the side of the full length of the pool, which adds a lot to the cost.
Anyway, I was wondering if I can lay my conduit two feet below ground level as they fill the trench. My pump is at the opposite end of the pool, and since I have to dig a 2 foot trench anyway, why not just use the same trench for the electric. In fact I'm think of laying some PVC about a foot deep to connet my sprinkler system later. Just trying to kill a few birds with one costly dig.