webfeet
08-22-2006, 11:16 PM
Hole was dug and walls, steps and spa were set yesterday. Then it rained last night- yuk. Today, PC installed coping, braced steps and spa ( spa is much like the steps that are installed with the liner pool -except its a semi-circle shape.) He also poured concrete around the bottom of the braces today, and started spreading the mountains of dirt into low places on our property. He spread about half of it. We are doing the wiring and he will do the plumbing.
School has started and I am back teaching.:D So, it is really hectic here. We're gone all day and come home to look at the progress. I am taking pictures, but don't have time to post any.:( Hopefully, in a few weeks ( after parent/teacher conferences), I'll have time to post some pictures.
School has started and I am back teaching.:D So, it is really hectic here. We're gone all day and come home to look at the progress. I am taking pictures, but don't have time to post any.:( Hopefully, in a few weeks ( after parent/teacher conferences), I'll have time to post some pictures.