joliecher
05-13-2006, 12:12 PM
Our builder made an error on the water level. A tanning ledge was supposed to have 10" of water and it will only have 6" with no easy access (it is in deep water) I will compromise with 8" and in order to raise the water level, they (the builder) proposed adding two inches of concrete on top of the gunite to raise the level. The concrete is just troweled on without any reinforcement. Decking will be laid on it and I fear the concrete will shift or that water will seep through the less dense concrete. The permanent water level will still be below the applied concrete but only by 1 inch.
The also missed the location of two drains and had to chisel out the gunite to move them. When I asked if they would leak, they said they would use a special patch concrete and they do it all the time...
any thoughts?
The also missed the location of two drains and had to chisel out the gunite to move them. When I asked if they would leak, they said they would use a special patch concrete and they do it all the time...
any thoughts?