tapevad
06-26-2011, 05:04 PM
i am building a inground pool here in spain and need advice in next steps, i have built walls with concrete blocks with re-bars inside vertical and horizontal i have also built the steps (but have been told that they need ripping out )so that the base can be laid with concrete then re-bars before gunite is sprayed then construct steps is this necersery ?.
PoolDoc
06-27-2011, 09:53 AM
Please note: original poster is asking about pool building in Spain
Hi Tape;
I doubt anyone here can answer your question. Pool chemistry is universal, but pool chemicals are not, so it's often hard to answer pool chemistry questions from other countries: we don't know what's available.
Pool construction is even worse. Codes (legal requirements), equipment, available contractor skills are ALL very different from what's available in the US -- not necessarily worse -- just different.
This means that advice that might be perfectly good here, is bad advice for you, there in Spain.
Sincerely,
Ben